Send Message
products

Ultrasonic Heating Double Wall Paper Cup Making Machine For Hot Drink Cups

Basic Information
Place of Origin: China
Brand Name: Shunda
Certification: CE,ISO9001
Model Number: SMD-80A
Minimum Order Quantity: 1 set double wall paper cup machine
Price: negotiable
Packaging Details: Seaworthy and suitable for bumpy roads. Strong wooden box and firm plate
Delivery Time: 21 work days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 18 sets per Month
Detail Information
Speed: 80-100 Pcs/min Cup Size: 6-22OZ
Raw Material: 135-450 GRAM Configuration: ULTRASONIC
Output: 10KW,380V/220V,60HZ/50HZ Air Compressor: 0.4 M³/Min 0.5MPA
Net Weight: 3.0 TONS Dimension Of Machine: 2500×1800 ×1700 MM
Dimension Of Cup Collector: 900 ×900 ×1760 MM
High Light:

paper cup machine

,

paper cups machines


Product Description

Ultrasonic Heating Double Wall Paper Cup Making Machine For Hot Drink Cups

 


Technical Data:

 

Model SMD-80A
Speed 80-100 pcs/min
Cup size Top Diameter: 100mm(max)
Bottom Diameter: 80mm(max)
Height: 140mm(max)
Raw material 135-450 GRAM
Configuration ULTRASONIC
Output 10KW,380V/220V,60HZ/50HZ
Air compressor 0.4 M³/Min 0.5MPA
Net weight 3.0 TONS
Dimension of machine 2500×1800 ×1700 MM
Dimension of cup collector 900 ×900 ×1760 MM

 

 

Advantages:

 

1.It has 2 sets of original imported hot air system Leister guarantee the stability of heating.


2.Ultrasonic seal the paper cup body,can produce both single and double PE coated paper.

Ultrasonic Heating Double Wall Paper Cup Making Machine For Hot Drink Cups 0


3.Open cylindrical can divide locating,heigh precision.

Ultrasonic Heating Double Wall Paper Cup Making Machine For Hot Drink Cups 1


4.Automatically Oil lubrication system .

Ultrasonic Heating Double Wall Paper Cup Making Machine For Hot Drink Cups 2


5.Servo motor control the gap of the bottom-paper within 0.1mm.

Ultrasonic Heating Double Wall Paper Cup Making Machine For Hot Drink Cups 3


6.Gear and open cylindrical promote the stability and speed.

 

 

Finished products:


Taiwan Evergreen Brand Ultrasonic Heating Double Wall Paper Cup Making Machine
 


Output counting:

 

Normal Running Speed 90 pcs/min 50 pcs/min 40 pcs
1 Day(12 Hours) 90pcs*60min*12hours=64800 pcs 50pcs*60min*12hours=36000 pcs 28800pcs
1 Week (5 Days) 64800pcs*5days=324000pcs 36000pcs*5days=180000pcs 144000pcs
1 Mouth(22 Days) 64800pcs*22days=1425600pcs 360000pcs*22days=792000pcs 633600pcs

 


About us:


Haining Chengda Paper Cup Machinery CO.,Ltd is established in year 1998, as Chinese earliest paper cup machine manufacturer--design,research,manufacture,sell and serve , we have developed, matured and specialized in machine types as below,


--Middle speed paper bowl machine SMD-80B 70-80cups/min
--Middle speed double wall paper cup machine SMD-80A 80-100cups/min
--High speed paper cup machine SMD-90 100-120cups/min
 
With decade years of technology accumulation,advanced manufacturing skills and thoughtful after-sale services, Chengda(Shunda) Paper Cup Machinery CO., Ltd has self-supported import and export right and goes though CCC and CNAS certificates,also get CE and ISO9001 certified.
 
We have been supported hundreds of paper cup factories around the globe,especially enjoy high reputation in USA,Finland,Algeria,etc.
 
We are always holding the faith of “quality wins market,honest wins trust”. And in the future we should increase technology creation,focus on improving manufacturing skills and lead trend of paper cup machine industry.

 

COMPANY CULTURE 

Consistent Concept, Achieve Centennial Chengda

Every company that has a dream of a hundred years needs employees with the same spirit, and every corner is infused with the essence of corporate culture. At Chengda, we have a good vision and work hard for it; in Chengda, we have a business philosophy of honesty and implementation, and in Chengda, we have a technical philosophy of innovation and introduction. To every new project research and development; in Chengda, we have a refined and rigorous production concept, and through the production, assembly and testing of each component; in Chengda, we have an efficient concept of work, a harmonious teamwork spirit, and Infiltrate into every business activity.

 

Vision: Leading the industry trend and achieving a century-old enterprise.

Concept: Integrity, innovation, rigor, and efficiency.

Mission: Provide turnkey solutions for the paper container manufacturing industry.

Goal: Technology leader in the global paper container molding machine industry


FAQ:
1. Q: Is your company a factory or trading company?
A: Our company is a factory.
 
2. Q:Where is your factory located? How can I visit there?
A:Our factory is located in haining City, Zhejiang Province, China, about 1.5 hours by car from Shanghai .All our clients, from home or abroad, are warmly welcome to visit our company !
 
3. Q:How does your factory do regarding quality control?
A:We hold firm faith that quality comes first,and promise 3 YEARS warranty.
    Because our debuggers test and adjust every machine for 1 week before packing and shipping out of workshop, no compromises on quality.

 

4. Will you teach how to use the machine?
Yes, engineers available to service machinery overseas or learn in our factory.

 

5. How about the shipment?
Normally 30-40 days after confirming order, detail delivery date should be decided according to
production season and order quantity.

 

6. Which payment term do you accept?
T/T, L/C

 

7. Do you have warranty?
1 year for electronic parts from shipment date
3 years for mechenical parts from shipment date

 

8.Do you have OEM/OEM service?
Yes, OEM/ODM service are available here. We can make some changes on machine according to your requirements.


1. Price term: FOB ShangHai Port, China


2. Payment term: T/T (30% as deposit, 70% balance before delivery) or L/C


3. Delivery term: 30-35 working days after received deposit and confirmed cup size


4. After sale service:
- The Operation Guidance, Manual Instruction and Electrical Schematic Diagram will be
sent with machine to guide the installation process works, adjust the whole
machine,production,avoid or solve the problem which the buyer will face.
- We will adjust the machine well for one week before the delivery, ensure the machine has
the perfect performance!
- We supply the free training of buyer, the training won’t stop until the buyer control the
whole lesson. The cost of air ticket, boarding and lodging should provided by buyer.


5. Warranty
- one year for electronic parts from the shipment date
- three years for mechnical parts from the shipment date

Contact Details
Suki

Phone Number : +8613586301909

WhatsApp : +8613586301909