Place of Origin: | China |
---|---|
Brand Name: | Shunda |
Certification: | CE,ISO9001 |
Model Number: | SMD-80A |
Minimum Order Quantity: | 1 set double wall paper cup machine |
Price: | negotiable |
Packaging Details: | Seaworthy and suitable for bumpy roads. Strong wooden box and firm plate |
Delivery Time: | 21 work days |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 18 sets per Month |
Speed: | 80-100pcs/min | Cup Size: | 6-22OZ |
---|---|---|---|
Raw Material: | 135-450 GRAM | Configuration: | ULTRASONIC |
Output: | 10KW,380V/220V,60HZ/50HZ | Air Compressor: | 0.4 M³/Min 0.5MPA |
Net Weight: | 3.0 TONS | Dimension Of Machine: | 2500×1800 ×1700 MM |
Dimension Of Cup Collector: | 900 ×900 ×1760 MM | Air Pressure: | 0.6-0.8Mpa |
Control System: | PLC | Cup Size: | 3-16oz |
Heating System: | Electric Heating | Material: | Stainless Steel |
Name: | Double Wall Paper Cup Machine | Outline Dimension: | 4500*1400*1800mm |
Paper Thickness: | 150-350g/m2 | Power: | 380V/50Hz |
Total Power: | 7.5KW | Warranty: | 1 Year |
Weight: | 2500KG | ||
High Light: | paper cup machine,paper cups machines |
High Speed Double Layer Paper Cup Making Machine With Plc Control And Servo Drive For Hot Drink Cups
Technical Data:
Advantages:
1.It has 2 sets of original imported hot air system Leister guarantee the stability of heating.
2.Ultrasonic seal the paper cup body,can produce both single and double PE coated paper.
3.Open cylindrical can divide locating,heigh precision.
4.Automatically Oil lubrication system .
5.Servo motor control the gap of the bottom-paper within 0.1mm.
6.Gear and open cylindrical promote the stability and speed.
Finished products:
Output Count :
Normal Running Speed | 90 pcs/min | 50 pcs/min | 40 pcs |
1 Day(12 Hours) | 90pcs*60min*12hours=64800 pcs | 50pcs*60min*12hours=36000 pcs | 28800pcs |
1 Week (5 Days) | 64800pcs*5days=324000pcs | 36000pcs*5days=180000pcs | 144000pcs |
1 Mouth(22 Days) | 64800pcs*22days=1425600pcs | 360000pcs*22days=792000pcs | 633600pcs |
1. Price term: FOB ShangHai Port, China
2. Payment term: T/T (30% as deposit, 70% balance before delivery) or L/C
3. Delivery term: 30-35 working days after received deposit and confirmed cup size
4. After sale service:
- The Operation Guidance, Manual Instruction and Electrical Schematic Diagram will be
sent with machine to guide the installation process works, adjust the whole
machine,production,avoid or solve the problem which the buyer will face.
- We will adjust the machine well for one week before the delivery, ensure the machine has
the perfect performance!
- We supply the free training of buyer, the training won’t stop until the buyer control the
whole lesson. The cost of air ticket, boarding and lodging should provided by buyer.
5. Warranty
- one year for electronic parts from the shipment date
- three years for mechnical parts from the shipment date
About us:
Haining Chengda Paper Cup Machinery CO.,Ltd is established in year 1998, as Chinese earliest paper cup machine manufacturer--design,research, manufacture, sell and serve, we have developed, matured and specialized in machine types as below,
--Middle speed paper bowl machine SMD-80B 70-80cups/min
--Middle speed double wall paper cup machine SMD-80A 80-100cups/min
--High speed paper cup machine SMD-90 100-120cups/min
With decade years of technology accumulation,advanced manufacturing skills and thoughtful after-sale services, Chengda(Shunda) Paper Cup Machinery CO., Ltd has self-supported import and export right and goes though CCC and CNAS certificates, also get CE and ISO9001 certified.
We have been supported hundreds of paper cup factories around the globe,especially enjoy high reputation in USA,Finland,Algeria,etc.
We are always holding the faith of “quality wins market,honest wins trust”.And in the future we should increase technology creation,focus on improving manufacturing skills and lead trend of paper cup machine industry.
FAQ:
1. Q: Is your company a factory or trading company?
A: Our company is a factory.
2. Q:Where is your factory located? How can I visit there?
A:Our factory is located in haining City, Zhejiang Province, China, about 1.5 hours by car from Shanghai .All our clients, from home or abroad, are warmly welcome to visit our company !
3. Q:How does your factory do regarding quality control?
A:We hold firm faith that quality comes first,and promise 3 YEARS warranty.
Because our debuggers test and adjust every machine for 1 week before packing and shipping out of workshop, no compromises on quality.
4. Will you teach how to use the machine?
Yes, engineers available to service machinery overseas or learn in our factory.
5. How about the shipment?
Normally 30-40 days after confirming order, detail delivery date should be decided according to
production season and order quantity.
6. Which payment term do you accept?
T/T, L/C