Place of Origin: | China |
---|---|
Brand Name: | Shunda |
Certification: | CE ISO9001 |
Model Number: | SHUNDA-80A |
Minimum Order Quantity: | 1 set double wall paper cup machine |
Price: | negotiable |
Packaging Details: | Standard seaworthy package, with PP film,wooden palte and wooden case |
Delivery Time: | 35-45 working days after confirmed cup size and received deposit |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 35 SETS per month |
Speed: | 80-100cups/min | Cup Size: | 6-22oz |
---|---|---|---|
Paper Weight: | 135-450gsm | Seal Mode: | Ultrasonic System & Hot Air |
Control Mode: | Mistubishi PLC | Output: | 10KW,380V/220V,60HZ/50HZ |
Air Consumption: | 0.4 M³/Min 0.5MPA | Dimension Of Machine: | 2500×1800 ×1700 MM |
Dimension Of Cup Collector: | 900 ×900 ×1760 MM | Net Weight: | 3.0 TONS |
Highlight: | paper cup machine,disposable paper products machine |
Double wall paper cup machine,high speed automatic double wall coffee paper cup sleeving machine
Specification
MODEL |
Paper Cup sleeve machine SHUNDA-80A |
SPEED |
70-80PCS/MIN |
CUP SIZE |
6-22OZ |
MATERIAL |
135-450GRAM |
CONFIGURATION |
ULTRASONIC&HOT AIR |
OUTPUT |
380V/220V,60HZ |
AIR COMPRESSOR |
0.4 M³/Min |
NET WEIGHT |
3 TONS |
MACHINE SIZE |
2500 ×1800 ×1700 MM |
COUNTER SIZE |
900 ×900 ×1760 MM |
Drive mode |
Open cylindrical cam |
Description
Paper Cup Sleeve machine is great thermal insulation container.
Our company developed fast speed double wall paper Cup machine, using Gear working, it has better promotion for noise,speed,stability .
Application
Coffee Cup double wall sleeve.
Highlights
Paper fan side seal:Hot air system for preheating, using ultrasonic for side seal. Ensure no water leakage during high speed running. Especially for double PE coated paper fan, have two side hot air system.
Open cylindrical cam: Our factory is the first one using two cam systems, this design more costly, but can let the top curling and bottom knurling more accuracy, stable and low noise. Cam adpots high strength Japan-SKD11 with quenching treatment,resistant to wear. Before set up on the machine, our factory will test running one week, to ensure each bearing at the suitable station.
All mouldings are after heat treat, 10 years usage is garuanteed.
Quality control
1).All parts are strictly inspected before assemblied onto machine.
2).10 year experience assembly workers,always follow standard quality rules.
3). 3 years warranty promise, 7 day 24 hour online/phone service availble.
Locate us -- 1.5 hours by car from Shanghai Pudong Airport.