Place of Origin: | China |
---|---|
Brand Name: | Shunda |
Certification: | FDA,SGS |
Model Number: | SHUNDA-80A |
Minimum Order Quantity: | 1 set |
Price: | negotiable |
Packaging Details: | Standard seaworthy package,with PP film,wooden plate and case |
Delivery Time: | 21 working days after 30% deposit |
Payment Terms: | T/T or L/C |
Supply Ability: | 20 SETS per month |
Product: | Double Wall Paper Cup Machine | Speed: | 90-100pcs/min |
---|---|---|---|
Material: | Single/Double PE Coated Paper | Paper Weight: | 135-450gsm |
Sealing Mode: | Ultrasonic&hot Air System | Inspection: | Panasonic Components |
Highlight: | paper cup machine,paper cups machines |
Double Wall Paper Cup Machine,ripple doublw wall paper cup sleeving machine
Parameters:
MODEL | SMD-80A |
Speed | 90-100 PCS/MIN |
Cup size Range | 6-22oz |
Paper request Gram | 135-450GSM(single and double PE coated paper) |
Heating system | ULTRASONIC&HOT AIR |
Output | 380V/220V,50/60HZ, 10 KW Three Phase four wire |
Air compressor | 0.5 M³/Min |
Net weight | 3 TONS |
Machinery Size | 2500 ×1800 ×1700 MM |
Counter Size | 900 ×900 ×1760 MM |
Finished Paper Cups:
As the sole professional manufacturer on the paper cup machine,our factory established in 1999,located in Haining City, Zhejiang Province. We have rich experience on the paper cup machine& paper cups making ,providing high-quality, comprehensive and advanced technical products to our customers all over the word. In our factory there is...
READ MORE →1. 18 years experience in the paper cup machine field.
2. Attend at least 3 machine fairs (in Beijing,Wuhan,Yiwu)to meet you.
3. Accept OEM and ODM services
1. Is you company a factory or trading compay?
---Our company is a factory, also have export license.
---Our factory is located in Haining City, Zhejiang Province, China, about 1.5 hours by car from Shanghai. All our clients from home or abroad are warmly welcome to visit our company !
---Quality is priority. Shunda people always attach great importance to quality controlling from the very beginning to the very end:
1).All raw material we used are environmental-friendly;---Yes, engineers available to service machinery overseas or learn in our factory.
---Normally 30-40 days after confirming order, detail delivery date should be decided according to
production season and order quantity.
---1 year for electronic parts from shipment date, 3 years for mechenical parts from shipment date
---Yes, OEM/ODM service are available here. We can make some changes on machine according to your requirements.