Place of Origin: | China |
---|---|
Brand Name: | Shunda |
Certification: | CE |
Model Number: | STD-80 |
Minimum Order Quantity: | 1 Set |
Price: | Negotiable |
Packaging Details: | Seaworthy and suitable for bumpy roads. Strong wooden box and firm plate |
Delivery Time: | 30-40 working days |
Payment Terms: | L/C, T/T, Western Union, MoneyGram |
Supply Ability: | 10 sets per Month |
Capacity: | 70-80pcs/min | Diameter: | 90mm Max |
---|---|---|---|
Height: | 220mm Max | Suitable Paper Thickness: | 135-450gsm PE/PLA Coated Paper |
Sealing Method: | Ultrasonic & Hot Air System | Running Power: | 12kw |
Air Compressor: | 0.4M3/min 0.5MPA | Net Weight: | 3400kg |
Machine Dimension: | 2500*1800*1700 | ||
Highlight: | round box making machine,tea cup manufacturing machine |
Environmentally Friendly High Speed Paper Tube Machine
Machine speficications:
Model | STD-80 |
Speed | 70-80 pcs/min |
Cup size | Diameter: 90mm(max) Height: 220mm(max) |
Raw material | 135-450gsm PE/PLA coated paper |
Configuration | Ultrasonic & hot air system |
Output | 12KW,380V/220V,60HZ/50HZ |
Air compressor | 0.4 M³/Min 0.5MPA |
Net weight | 3.4 TONS |
Dimension of machine | 2500×1800 ×1700 MM |
Product Advantages:
1. 2 sets of original imported hot air system Leister guarantee the stability of heating.
6.Gear work, long life for machinery
7.Inspection system by camera
8.Photoelectricity to track every step
Finished Products:
About us:
Established in 1998, Haining Chengda Machinery Co., Ltd. is a professional paper container equipment manufacturer. We have R&D,production and sales department .After 20 years of hard working, our company has a strong technical team and a research and development center cooperate with Taiwan's senior paper container molding technology team and obtained national patents such as a straight tube machine. Our company has modern assembly workshops, precision parts processing workshops, training centers, QA centers and other infrastructure. Our company has CE, ISO9001 certification system and national import and export rights.
In recent years, based on the characteristics of Chinese paper and the development trend of paper containers home and abroad, we have developed a batch of international synchronization technology unit of the intelligent molding Machine with automatic detection systems and remote connection system for paper cup machine, paper tube machine, paper lid machine,doner box machine and etc.
We lead the market by advanced technology and excellent product quality.In the future, we will continue to feed customers' needs, be brave in innovation, use perfect pre-sales and after-sales service systems to serve customers, and constantly explore the development of paper container molding machines. The new trend is to provide customers with total industry-wide solutions with competitive products.
Trade Show
Maintaince Attention:
1. Don't be in an environment of corrosive gas or smoke
2. Don't in the product may be splashed water, oil or use chemicals.
3. Please with stable voltage source power supply
4. make sure the power cord in good condition, so as not to cause fire or shock damage.
5. Instrument after electrify please don't touch input and output terminals, lest cause electric shock or instrument malfunction.
6. if you open the instrument shell, there may be a shock hazard.Because of power, has its internal capacitance charging, can keep certain voltage.
QC team:
A QC team with more than 10 professional and technical personnel. To ensure 100% products checking.
Material: Strictly control of material using, meet international requested standards.
Semi-finished products inspection: Product inspection before 100% finished.
Production line test: With work team or data engineer who will inspect machines and lines at fixed period.
Finished Product Inspection: Quality and property test before products are packed and loaded.
After-sale Service:
1. warranty: 3 year
2. the guide booklet will be sent with machine to guide the installation process works,adjust
the whole machine,production,avoide or solve the problem which the buyer will face.
3. we will adjust the machine well for one week before the delivery,ensure the machine has
the perfect performance.
4. we can dispatch technologists to buyer's factory,guiding installation,ajustment for a
period,the buyer incharge of the salary,traffic fee,boarding and lodging,communication and each day 100usd living allowances.
5. we supply the free training of buyer,the training won't stop until the buyer control the whole lesson!
6. we supply the consumable spare parts for frees for three year use.